Milford Haven Port Authority
Owner
Trust PortAddress
Port of Milford Haven
Head Office
Gorsewood Drive
Milford Haven
Pembrokeshire
SA73 3EP
Phone
01646 696100Milford Haven Port Authority
24/7 deep water port situated in South West Wales in one of the deepest natural harbours in the world and within close proximity of Atlantic trade routes. Over 17.0m depth of water available at all states of tide and the ability to handle vessels with drafts of up to 22.0m with no lock restrictions.
UK's largest handler of oil and gas, and capable of delivering 30% of UK gas demand, with high capacity gas and oil pipelines connecting to the centre of the UK.
4th largest UK port by volume with cargo volume of 34.9m Tonnes in 2016.
Services: Conservancy, Port Control / VTS, Pilotage, Marina Navigation Simulation/Training Suite, Oil and LNG Terminals, Ferry Terminal - (twice daily passenger and freight sailings to Rosslare (Irish Ferries)), General Cargo Port, Fish Docks & Aquaculture development, Leisure Marina, Cruise Calls / Tourism Destination, Commerical Property Portfolio, Marina Energy device testing/deployment, strong local engineering industry.
Additional contact details
Phone
Milford Haven Port Authority +44 (0)1646 696100 (8:30am-5pm Mon-Fri)
Port Control: +44 (0)1646 696136 (24/7)
Pembroke Port +44 (0)1646 696631 (24/7)
Pembroke Dock Ferry Terminal +44 (0)1646 623440 (24/7)
Milford Fish Docks +44 (0)1646 696300 (8:30am-5pm Mon-Fri)
Milford Marina +44 (0)1646 696312 (8:30am-5pm Mon-Fri)
Fish Docks & Marina Pierhead Contol (out-of hours) +44 (0)1646 696310 (24/7)
Quayside Properties +44 (0)1646 696380 (8:30am-5pm Mon-Fri)
enquiries@mhpa.co.uk
info@pembrokeport.com
enquiries@milfordfishdocks.com
enquiries@milfordmarina.com
enquiries@quayside.properties
Websites
https://www.mhpa.co.uk
https://www.pembrokeport.com
http://www.milfordfishdocks.com
https://www.milfordmarina.com
http://www.quayside.properties

Tidal range
Max vessel dimensions port has accommodated
Beam - n/aDraft - n/a
LOA - n/a
Port Services
Stevedoring services, bunkering (water & fuel), mobile cranage, boat lift, dry docks, boat repairers, tug boat assistance, pilotage, port control/VTS, leisure marina, fish docks, chilled fish storage, boat builders, light and heavy engineering, marine energy device fabrication, testing & deployment, marine energy testing area, cruise calls hosted, conservancy, marine navigation simulation/training centre, oil and LNG terminals, two-tier ferry terminal, general & heavy lift cargos, aquaculture development, commerical property rental.
Future Development Plans
Milford Waterfront (hotels, tourism, retail)
Pembroke Dock Marine (marine energy device fabrication and deployment)
Marine Energy Engineering Centre of Excellence
Marine Energy Test Area (within Haven)
South Pembroekshire Wave Demonstation Zone
Location
Milford Haven Port Authority quayside facilities
Milford Haven Port Authority Media
Chart Datum
Chart Datum (CD) is a level set low enough to ensure that the tide rarely falls below it. The UK usually determines this as being approximately the level of Lowest Astronomical Tide. In effect, this is the minimum depth that can be achieved by a quayside or port entrance channel.
Datwm Siart
Mae Datwm Siart (CD) yn lefel a osodir yn ddigon isel i sicrhau mai anaml iawn fydd y llanw yn disgyn oddi tano. Mae'r DU yn diffinio hyn fel arfer fel tua lefel y Llanw Seryddol Isaf. Mewn gwirionedd, dyma'r dyfnder lleiaf y gellir ei gyflawni gan lan y cei neu sianel mynedfa porthladd.
Vessel Dimensions
Length overall (LOA) means the maximum length of a vessel's hull when measured parallel to the waterline.
A ship’s beam refers to its width at the widest point, when measured at the ship's nominal waterline.
The draft of a ship's hull is the vertical distance between the waterline and the bottom of the hull (keel), which includes the thickness of the hull. The draft of a ship or boat signifies the minimum depth of water it can safely navigate.
Dimensiynau Llongau
Mae cyfanswm hyd (LOA) yn golygu uchafswm hyd corff llong pan fesurir hynny yn gyfochrog â llinell y dŵr.
Mae lled llong yn cyfeirio at ei lled yn y rhan lletaf, pan fesurir hynny wrth linell dŵr nominal y llong.
Dyfnder corff llong yw'r pellter fertigol rhwng llinell y dŵr a gwaelod corff y llong (cêl), sy'n cynnwys trwch corff y llong. Mae dyfnder cwch neu long yn nodi isafswm dyfnder y dŵr y gall ei fordwyo'n ddiogel.